Septic and soils
Without public sewer, a lot is only buildable if its soils can support a septic system, and where the septic goes can decide where the house goes.
How do you know if land in Maine can support a septic system? A Licensed Site Evaluator digs test pits, reads the soil layers and the depth to the water table and ledge, and prepares a septic design on Maine's HHE-200 form. Many evaluators also run a percolation test as a best practice. The design shows whether and where a system can go, which should happen before you commit to the purchase.
The process
Septic and the house
Where you put the house largely determines where the septic has to go, and the reverse is often true too. The best septic location is usually downhill from the house, so wastewater flows by gravity.
If you site the house first and the only good soils end up uphill or far away, you may need a pumped system. That adds equipment, electricity and maintenance, and can make the project significantly more expensive. On many lots, the smart move is to find the septic location first, then design the building envelope around it.
Soil types
| Soil | Effect on septic and building |
|---|---|
| Sand | Usually drains well and supports a standard system. |
| Clay | Drains poorly; may need an engineered or larger system, and building areas often need a preload. |
| Ledge | Shallow bedrock limits where a system can go and may require fill to build the system up. |
| High water table | Seasonal water close to the surface may require a raised system. |
Cost drivers
Wells
Most rural lots in Southern Maine use a drilled well. Water is generally plentiful here, so wells are usually not the problem. Water quality is the thing to test: arsenic and radon in water both turn up in Maine, and both are highly treatable with the right system.
Keep the required separation between the well and the septic system in mind when laying out the lot. Your site evaluator and well driller will help you place both.
Zoning, soils and septic, wells, shoreland rules and financing land. Download it instantly.
Get the free guideFAQ
A Licensed Site Evaluator, licensed by the state, who tests the soils and prepares the HHE-200 design.
Maine's process is based on reading the soil profile in test pits, but many evaluators also run a percolation test as a best practice when designing the system.
Yes. Some soils cannot support a standard system. Others can with an engineered design at a higher cost. Test before you commit to buying.
A gravity system lets wastewater flow downhill to the leach field. A pumped system uses a pump to move it uphill or farther away, which adds cost and maintenance.
Usually, but test it. Arsenic and radon in water are found in parts of Maine and are treatable.
Talk to someone who lives here
Ask Harrison anything. No pressure, no obligation and no calls unless you ask for one.
Instant download. No waiting on an email.
Town-by-town guides, real prices and local answers for York and Cumberland County, Maine.
207-956-0872
112 Main St, Suite 202
Biddeford, ME 04005
Open daily, 8 AM to 7 PM
Move to Southern Maine is presented by Harrison Smith, a licensed real estate agent with eXp Realty. This website is owned and operated by Harrison Smith and is not an official website of eXp Realty. Information is believed accurate but not guaranteed; verify school, tax and zoning details with the source listed on each page.
© 2026 Move to Southern Maine. Digital Marketing by Evolution Media Group